Airport Project Airport Project

Bangor International Airport Project

62,868 square feet of 1" fiberglass was removed from the sidewalls of 3 aircraft hangars.
After the surfaces were properly prepared, 2 inches of 2 pound
density polyurethane foam (staycell) was applied. An additional coat of Stayflex was installed over the foam to provide the required chemical resistant, durable, fire barrier.

Airport Project Airport Project
Airport Project Airport Project
Airport Project Airport Project
Airport Project Airport Project
Airport Project  

 

DEA DEA

Plattsburgh, NY DEA Lease Building

21,000 Square Foot 2 Story Facility, 16ft. 1st Story, 18ft. 2nd Story Installation of Cellulose throughout entire exterior wall structure of facility.
Roof/Wall Joint Sealing throughout entire 2nd floor exterior wall
Window and Door Airsealing with 1 component minimally expanding foam throughout entire facility.

DEA DEA

 

ECP ECP

ECP's New office

ECP ECP
Mexico Mexico

Mexico, NY Mexico Elementary School

Problem: Severe Ice Damming on Roof System
Solution: Retrofit Air-barrier so that it is continuous throughout structure; Install Cellulose insulation to the proper R-value.
Pictures: Show before and after roughly a year apart from each other.